Develop - build - sell

One of the main branches of our activity is the development of renewable energy installations in the Develop – Build – Sell formula.

Our strategy is based on three key pillars:

Intensive project turnover: We dynamically manage the project portfolio, which allows us to quickly introduce new initiatives and adapt to changing market conditions.

Fast realization of the development margin: Thanks to experience and effective management methods, we effectively carry out projects from the conceptual phase to finalization, which allows for a quick return on investment.

Acquiring implementation contracts for sold projects: We strive to acquire implementation contracts for projects that we sell. This generates additional revenues and ensures high quality of implementation, strengthening our position on the market.

Thanks to this strategy, we dynamically develop our business, providing high-quality renewable energy solutions and contributing to sustainable development.

893 MW

Wave with points

total capacity in the portfolio of our own projects

32 MW

Wave with points

in progress

197 MW

Wave with points

ready to build

77 MW

Wave with points

the power of commercialized projects

WORK WITH THE BEST
Logo

Do you have land that you can use for a photovoltaic or wind farm? Do you want to sell or buy a project? Contact us

Maciej Grzesiewski Head of M&A
Bogusław Pieczykolan Director of Development Department

ONDE Portfolio Ready to Buy

The portfolio of own RES projects includes 31 projects with a total capacity of 893 MW. The power plants are at various stages of advancement – from the greenfield phase, through projects with issued connection conditions and investments ready for construction, to installations already implemented.

 14/419MW 3/130MW 4/33MW 3/194MW 1/7MW 3/111MW 1/36MW 1/40MW
Ilość farm / Łączna moc
Województwo zachodniopomorskie

Development

Solar farms: 14

Łączna moc: 419MW

Stan na sierpień 2024

PV Cyranka

PV Cyranka was Onde’s first own implementation. It is a project with a total capacity of 18 MW, consisting of two photovoltaic farms Giżycko 1 and Giżycko 2. The power plant was put into operation in 2023.

The installation was purchased by ENGIE Zielona Energia, which is part of the global ENGIE concern. Onde’s O&M department is responsible for the operation of the project.

Zobacz wszystkie projekty

PV Jelenia Góra

PV Jelenia Góra is a project with a capacity of 6.7 MWp. Ultimately, it is to supply over 7,400 MWh/year, which corresponds to the demand of almost 3,000 households.

Zobacz wszystkie projekty

PV Lewałd Wielki

PV Lewałd Wielki is our largest own photovoltaic project with a total capacity of 32 MWp.

The project initially assumed an installation at the level of 25 MWp, but thanks to a series of optimizations by our development team, it increased its capacity by almost 30%!

The construction is to be completed by April 2025.